KJ212i Intelligent Tunnelling Drilling Rig

  • Drilling method:Tophammer

  • Operation: Teleoperation systems

  • Hole diameter:32 mm - 89 mm

  • Climbing capacity:≤14°

  • Operating range:3.5*2.4-9*5.8m

  • Engine:80hp/59kW

Category: Tunneling jumbos

Product Description

Specially designed for low roadway and suitable for the drilling of hard rock mine whose sectin falls in the range of 3.5m*2.4m-9m*5.8m.

  • Auxiliary shutdown system. It is equipped with laser rangefinder to guide the drilling rig to stop in a reasonable area covering the drilling ranger of the working face,and then automatically deploy the legs and adjust the level of the drilling rig.

  • Analog computing system. After scanning the working face and processing by the system,the construction and display of the 3D graphics of the working face are realized. The rationality of the hole position is calculated according to the mine hole layout scheme,and the optimal drilling sequence is determined.

  • Hole positioning system. The drill boom and beam are automatically driven to the target position in the drilling sequence to complete the hole position.

  • Automatic drilling system. Automatically complete all drilling operations,such as opening,drilling, drilling parameter adjustment,anti-stuck drilling adjustment,hole washing and exit until the drilling task is completed.

  • Remote control system. In mines where the roadway network conditions are met, the ground control room can be networked to achieve remote operation,and one person can operate multiple machines,reducing or even canceling the drilling site operator.

  • Data collection and analysis processing module. The drilling process data is collected to provide a basis for improving the drilling process and make the equipment more and more efficient.

Technical Parameters of KJ212i Robot Tunneling Jumbo

Dimensions and Weight
Length12200mm
Width2050mm
Height1990/2510mm
Weight13000 kg
Travelling speed, level10 km/h
Climbing capacity25% (14°)
Safety protection
Noise level<100 dB(A)
Lifting safety roofMeet the requirements of FOPS and ROPS.
Drilling system
Rock drilling1×HC501×HC95/YYG18UHC95LMH/YYG22U
ShankR38/T38
Impact power13kW20kW/18KW21KW/22KW
Frequency62 Hz62 Hz/57Hz62Hz/53Hz
Hole diameterΦ32-76mmΦ42-89mmΦ42-102mm
Rolling of the propelling beam360°
Feed extension1600mm
ModelK36
FormAutomatic leveling
Extension of drill boom1800mm
Electric Hydraulic pump unit
Electric motor45kW55kw75kw
Impact- propelling-BoomVariable axial piston pump
RotationGear pumps
Filter precision10μ
Hydraulic oil tank240L
Hydraulic coolerWater cooler
Working pressure380V
Frequency50Hz
Starting methodStar - triangle
Cable capacity of the reel100m80m
Outer diameter of cableΦ28mmΦ32mm
Specifications of cable3×35+3G6+2×1.53×50+3G10+2×1.5
Air and water system
Air Compressor1×DLGF0.7/8-5.5(B)
Capacity0.7m3/min
Pressure6-8bar
Device of shank lubricationElectrical pulse lubrication pump
Air consumption for lubrication0.3m3/min
Oil consumption for lubrication180-250g/h
Power of Water Pump1.5kW4kw
Pump Capacity3m3/h5m3/h
Chassis
Diesel engineQ3.9CS4-80C   59kW/2500rpm
TransmissionClosed-wheel drive traveling system
Swinging angleThe rear axle swings for ±10°
Steering mechanism±40° articulated steering
Travel brakeMulti-disc  brake
Parking brake
Fuel tank30L


KJ212i diagram.png


Leave a Review